INFO

This constuction that this site is about, did We start on in 1994. First We started with building a antresolplan in a bigger local, putting up walls, building a stair sort of speak, built a room 100 sq.m.

This was the beginnig of this construction, in 1998 I thought it was to small so We built 140 sq.m more as you can see on the photos and I filled it with more MJ.

Landscape is not the first We build, as you can see on the photos, We dont have a blueprint We just build and lay the rails as it comes and We can rebuild parts over and over again before We are satisfied. We want all the rails and electricity done so that no accidents like derailment.

We drive the trains with full length among others, 4 ea ironoretrains in full length and so on.
Its about 2:km railtrack. It´s as a double track but its a long trail that turns up and down. It take about 40-45 min to drive a trainset in normal speed round it all so you can take a break and drink coffee or so meanwhile.

It is an analog two rails scale HO construction and if We are concentrated,We can drive 15 trains at the same time on the track.

On this page We will keep on writing about our trains, so come back!

See you soon!

Kicki 2004